Videos

Dunn #1

After we applied an advanced treatment to our Dunn #1 to clean it up, we needed the ability to continually produce the well with a slower pump rate, so we purchased a Variable Speed Drive and changed out the sheave at the gearbox to a 36" wheel. For this well, our gas production for 2018 has improved 17% and our oil production improved 29% compared to the 2017 production numbers.

Graham #22

Set up of Open Hole Completion equipment on Graham #22:

Gathering Samples:


 

Graham #23